Free bidder tool

Know where your bid should stop.

Work backward from resale proceeds to a maximum storage auction bid. Allow for costs, uncertainty and the profit you want to keep.

Free to use · No sign-inUSD · Calculated in your browser

Your numbers, your ceiling

Build your bid budget

Start with the example, then enter your own estimates.

Start with resale

What could the visible goods bring in?

After selling fees, shipping you pay and expected returns.

Protect your margin

Account for the work, the unknowns and your profit.

Include truck, fuel, disposal, storage and your labor.

Leave room for the unexpected.

What you want left after every cost.

Allow for auction charges

The hammer price is only part of the bill.

Use the combined rate from your listing’s actual terms.

No sign-in. Your amounts stay in this browser.

Illustrative example

Maximum hammer bid

$333.33

Your ceiling before the auction’s permitted bid increment.

Where the money goes

Expected resale proceeds
$1,000.00
Cleanout and transport
−$250.00
Risk reserve
−$100.00
Required profit
−$250.00
Budget before auction fees
$400.00
Fees and tax (20%)
$66.67

Round down to the auction’s allowed bid increment. Recheck your ceiling if your costs or the evidence change.

A planning estimate, not a guarantee of proceeds. Optional analytics records a completion event without your amounts.

Understand your ceiling

Start with expected resale proceeds after selling expenses. Subtract cleanout costs, a risk reserve and required profit. Divide the remainder by one plus the effective auction fee-and-tax rate. A zero or negative remainder means there is no room for a bid under those assumptions.

The formula behind the calculator

Maximum hammer bid = max(0, (net resale proceeds − fixed costs − reserve − required profit) ÷ (1 + effective overhead percentage ÷ 100)). Results are rounded down to cents. Round down again to the auction’s permitted bid increment.

The prefilled example uses $1,000 proceeds, $250 fixed costs, $100 reserve, $250 profit and 20% overhead. It yields a $333.33 ceiling. The 20% is an example input, not the fee of a particular platform.

Use the actual fees and tax base

This calculator accepts one effective percentage of the hammer price. If a hypothetical premium is 15% and an 8% tax applies to both the bid and premium, the effective rate is 24.2%, calculated as (1.15 × 1.08 − 1) × 100.

Minimum fees and flat charges are not modeled automatically. Include a conservative fixed amount under costs, or calculate the effective rate at the bid you are considering. Verify the result against the actual terms and avoid counting any charge twice. Keep refundable deposits in your cash budget separately.

Build a complete cost budget →
Better inputs make a more useful ceiling

Use cautious net proceeds supported by identifiable goods and comparable sales. Closed boxes contribute no assumed proceeds. Include the value of your own labor in fixed costs, and keep the reserve separate from the profit you want to retain.

This arithmetic tool does not inspect photos, fetch marketplace prices, calculate statutory taxes or place bids. Try lower proceeds and higher costs before committing. All calculations run locally; no AI request is made.

See a worked report with a pass decision →How much should you bid? →